• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Electrical Engineering News and Products

Electronics Engineering Resources, Articles, Forums, Tear Down Videos and Technical Electronics How-To's

  • Products / Components
    • Analog ICs
    • Battery Power
    • Connectors
    • Microcontrollers
    • Power Electronics
    • Sensors
    • Test and Measurement
    • Wire / Cable
  • Applications
    • 5G
    • Automotive/Transportation
    • EV Engineering
    • Industrial
    • IoT
    • Medical
    • Telecommunications
    • Wearables
    • Wireless
  • Learn
    • eBooks / Handbooks
    • EE Training Days
    • Tutorials
    • Learning Center
    • Tech Toolboxes
    • Webinars & Digital Events
  • Resources
    • White Papers
    • Design Guide Library
    • Digital Issues
    • Engineering Diversity & Inclusion
    • LEAP Awards
    • Podcasts
    • DesignFast
  • Videos
    • EE Videos and Interviews
    • Teardown Videos
  • EE Forums
    • EDABoard.com
    • Electro-Tech-Online.com
  • Bill’s Blogs
  • Advertise
  • Subscribe

2 Koreas move closer to reopening factory park

August 14, 2013 By HYUNG-JIN KIM & YOUKYUNG LEE, Associated Press

Kim Kiwoong, right, the head of South Korea's working-level delegation, shakes hands with his North Korean counterpart Park Chol Su, left, before their meeting at Kaesong Industrial District Management Committee in Kaesong, North Korea, Wednesday, Aug. 14, 2013. Officials from North and South Korea resumed talks Wednesday over the fate of a shuttered factory park the rivals jointly ran until Pyongyang pulled out its workers in April. (AP Photo/Korea Pool via Yonhap)SEOUL, South Korea (AP) — North and South Korea on Wednesday moved closer to reopening a jointly run factory park, raising hopes for an improvement in ties between rivals that were trading war threats this spring.


There was no word about when operations might resume, but the Koreas’ meeting, while not conclusive, can be considered progress after six failed rounds of talks, the last of which ended in a scuffle.


The industrial complex in North Korea’s third-largest city, Kaesong, had been the last symbol of cooperation between the Koreas until Pyongyang halted operations during a torrent of threats earlier this year that included vows of nuclear strikes on Washington and Seoul.


The Koreas released a statement saying they will “actively” make efforts to help South Korean companies repair facilities and resume operations at Kaesong.


Chief South Korean delegate Kim Kiwoong indicated cautious optimism, saying the joint statement was “not the end but a beginning” and that it was difficult to say exactly when the park might be reopened, according to South Korean media pool reports.


In an unexpected twist, both countries said they want to attract foreign companies to the park and would allow it to have Internet and mobile phone connections if operations resume.


Kaesong’s lack of Internet and mobile connections frustrated South Korean factory managers who relied on landline phones and faxes to communicate with the South. North Korea has a domestic mobile phone service and Intranet which are walled off from global networks.


North Korea has been trying to attract foreign investors in other free economic zones but no major progress has been reported. It is uncertain whether any foreign companies would be willing to brave Kaesong. The park’s reputation has been tainted by the four-month shutdown, which caused losses for the South Korean companies with assembly lines at the complex.


The industrial park combined South Korean initiative, capital and technology with cheap North Korean labor. It was also a rare source of hard currency for North Korea, though the impoverished country chafed at suggestions that it needed the money Kaesong generated.


The statement Wednesday said North and South Korea agreed to soon launch a joint committee meant to carry out their agreement.


Ties have improved somewhat in recent weeks, but Wednesday’s talks come ahead of military drills next week between South Korea and its U.S. ally. Pyongyang used a previous routine drill between the allies, along with U.N. sanctions over its February nuclear test, to justify its outburst of threatening rhetoric in March and April.


The decade-old industrial park had survived previous periods of tension, including attacks blamed on Pyongyang that killed 50 South Koreans in 2010, and the shutdown of other big cooperation projects.


By the end of 2012, South Korean companies had produced a total $2 billion worth of goods during the previous eight years.


North Korea is estimated to have received $80 million in workers’ salaries in 2012, an average of $127 a month per person, paid in U.S. dollars, according to the Unification Ministry in Seoul.


For North Korea, the park’s resumption is important because the country wants to draw outside investment to revive the economy, said Chang Yong Seok, a senior researcher at Seoul National University’s Institute for Peace and Unification Studies.


Pyongyang has to take care of its 53,000 Kaesong workers, and wants a return of the hard currency Kaesong provided, Chang said.

You Might Also Like

Filed Under: Components

Primary Sidebar

EE Engineering Training Days

engineering

Featured Contributions

Meeting demand for hidden wearables via Schottky rectifiers

GaN reliability milestones break through the silicon ceiling

From extreme to mainstream: how industrial connectors are evolving to meet today’s harsh demands

The case for vehicle 48 V power systems

Fire prevention through the Internet

More Featured Contributions

EE Tech Toolbox

“ee
Tech Toolbox: Internet of Things
Explore practical strategies for minimizing attack surfaces, managing memory efficiently, and securing firmware. Download now to ensure your IoT implementations remain secure, efficient, and future-ready.

EE Learning Center

EE Learning Center
“ee
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for EE professionals.
“bills

R&D World Podcasts

R&D 100 Episode 10
See More >

Sponsored Content

Advanced Embedded Systems Debug with Jitter and Real-Time Eye Analysis

Connectors Enabling the Evolution of AR/VR/MR Devices

Award-Winning Thermal Management for 5G Designs

Making Rugged and Reliable Connections

Omron’s systematic approach to a better PCB connector

Looking for an Excellent Resource on RF & Microwave Power Measurements? Read This eBook

More Sponsored Content >>

RSS Current EDABoard.com discussions

  • What is the difference between MIMO antenna elements arragned radially across the pentagon shaped substrate versus rectangle shaed substrate?
  • Simple Active Bandpass Filter Oscillates
  • TMP117 > Can not read temperature on LCD
  • Power switches to replace Mechanical Relay in the HV pulse tester setup
  • Output return loss mismatch

RSS Current Electro-Tech-Online.com Discussions

  • Guitar electronics project
  • can a AT89C51 be used as a rom?
  • JBL charge 4 dead motherboard?
  • going out on a limb and praying the schematic is correct
  • Actin group needed for effective PCB software tutorials
Search Millions of Parts from Thousands of Suppliers.

Search Now!
design fast globle

Footer

EE World Online

EE WORLD ONLINE NETWORK

  • 5G Technology World
  • Analog IC Tips
  • Battery Power Tips
  • Connector Tips
  • DesignFast
  • EDABoard Forums
  • Electro-Tech-Online Forums
  • Engineer's Garage
  • EV Engineering
  • Microcontroller Tips
  • Power Electronic Tips
  • Sensor Tips
  • Test and Measurement Tips

EE WORLD ONLINE

  • Subscribe to our newsletter
  • Teardown Videos
  • Advertise with us
  • Contact us
  • About Us

Copyright © 2025 · WTWH Media LLC and its licensors. All rights reserved.
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media.

Privacy Policy