• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Electrical Engineering News and Products

Electronics Engineering Resources, Articles, Forums, Tear Down Videos and Technical Electronics How-To's

  • Products / Components
    • Analog ICs
    • Battery Power
    • Connectors
    • Microcontrollers
    • Power Electronics
    • Sensors
    • Test and Measurement
    • Wire / Cable
  • Applications
    • 5G
    • Automotive/Transportation
    • EV Engineering
    • Industrial
    • IoT
    • Medical
    • Telecommunications
    • Wearables
    • Wireless
  • Learn
    • eBooks / Handbooks
    • EE Training Days
    • Tutorials
    • Learning Center
    • Tech Toolboxes
    • Webinars & Digital Events
  • Resources
    • White Papers
    • Educational Assets
    • Design Guide Library
    • Digital Issues
    • Engineering Diversity & Inclusion
    • LEAP Awards
    • Podcasts
    • DesignFast
  • Videos
    • EE Videos and Interviews
    • Teardown Videos
  • EE Forums
    • EDABoard.com
    • Electro-Tech-Online.com
  • Bill’s Blogs
  • Advertise
  • Subscribe

Advice on broadband stimulus pours in

April 14, 2009 By Brian Santo

The Federal Communications Commission asked for recommendations for how to spend $7.2 billion to make broadband more available to more Americans, and the natural result is a flood, an avalanche, a storm, a tsunami of documents from the likes of the National Cable & Telecommunications Association (NCTA) and the American Cable Association (ACA), as well as other communications organizations, companies, consultants, experts and pundits.

The NCTA provided official testimony (including a 39-page document) that makes the top-line plea that the “$7.2 billion provided for under the Recovery Act should be used to complement, not compete with, the vibrant broadband marketplace that exists in most areas of the country.”

Cable and phone companies rarely agree on much, but both the NCTA and Verizon stressed that making broadband available is only half of the issue. The other half is adoption. Many Americans still do not have (or even want) computers, and among those that do, affordability of broadband will be an issue.

Verizon suggested three principles to guide the broadband stimulus program: Be open to a wide range of projects to help finish what has already been started; rely on state and local expertise in identifying unserved areas; and maintain transparency and accountability.

The Progress & Freedom Foundation (PFF) urged the Federal Communications Commission, and those responsible for distribution of the grants, to clearly define the terms “unserved,” “underserved” and “broadband” as presented in the Act. “This will avoid inconsistency and misallocation of funds, which will be critical to the program’s success,” wrote Barbara Esbin and Kenneth Ferree, PFF senior fellow and president, respectively.

The comments echo those of the ACA, which published an overview of its official comments yesterday (story here).

PFF, which leans toward conservative free-market philosophy, advised funding existing providers “rather then supporting second or third entrants in a market.”

The notion dovetails nicely with what the ACA and the NCTA have been saying.

While others painted in broad strokes, the ACA noted its members are already in those unserved and underserved markets. “ACA’s members – small, independent cable companies first to deploy broadband facilities in rural America – are the ideal candidates for receiving economic stimulus funding to spread broadband into those truly remote areas that have been economically challenging to serve,” ACA President and CEO Matthew Polka said in ACA testimony. “In addition, funding of middle-mile projects – also an ACA priority – would unquestionably improve broadband performance in underserved communities.”

More Broadband Direct 04/14/09:
•  PacketCable 2.0 OKs augur new services
•  Arris amps up its D5 edge QAM
•  Dunbar joins SeaChange as COO
•  Advice on broadband stimulus pours in
•  Tennessee bill to deregulate phone service moves
•  EU to sue Britain for not applying Internet privacy rules
•  Dilithium promises better mobile video transmission
•  Study: Consumers want mobile customer care
•  Obama eases restrictions for Cuban telco market
•  Report: Femtocells to dominate for indoor coverage
•  Broadband Briefs for 04/14/09

 

You Might Also Like

Filed Under: Wire and Cable Tips

Primary Sidebar

EE Engineering Training Days

engineering

Featured Contributions

Integrating MEMS technology into next-gen vehicle safety features

Five challenges for developing next-generation ADAS and autonomous vehicles

Robust design for Variable Frequency Drives and starters

Meeting demand for hidden wearables via Schottky rectifiers

GaN reliability milestones break through the silicon ceiling

More Featured Contributions

EE Tech Toolbox

“ee
Tech Toolbox: 5G Technology
This Tech Toolbox covers the basics of 5G technology plus a story about how engineers designed and built a prototype DSL router mostly from old cellphone parts. Download this first 5G/wired/wireless communications Tech Toolbox to learn more!

EE Learning Center

EE Learning Center
“ee
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for EE professionals.
“bills
contribute

R&D World Podcasts

R&D 100 Episode 10
See More >

Sponsored Content

Designing for Serviceability: The Role of Interconnects in HVAC Maintenance

From Control Boards to Comfort: How Signal Integrity Drives HVAC Innovation

Built to Withstand: Sealing and Thermal Protection in HVAC Sub-Systems

Revolutionizing Manufacturing with Smart Factories

Smarter HVAC Starts at the Sub-System Level

Empowering aerospace E/E design and innovation through Siemens Xcelerator and Capital in the Cloud

More Sponsored Content >>

RSS Current EDABoard.com discussions

  • Diode recovery test Irrm timing.
  • Battery Deep Discharge – IC Workarounds?
  • The Analog Gods Hate Me
  • Safe Current and Power Density Limits in PCB Copper(in A/m² and W/m³) simulation
  • Why so few Phase shift full bridge controllers?

RSS Current Electro-Tech-Online.com Discussions

  • Wideband matching an electrically short bowtie antenna; 50 ohm, 434 MHz
  • The Analog Gods Hate Me
  • Simple LED Analog Clock Idea
  • PIC KIT 3 not able to program dsPIC
  • Parts required for a personal project
Search Millions of Parts from Thousands of Suppliers.

Search Now!
design fast globle

Footer

EE World Online

EE WORLD ONLINE NETWORK

  • 5G Technology World
  • Analog IC Tips
  • Battery Power Tips
  • Connector Tips
  • DesignFast
  • EDABoard Forums
  • Electro-Tech-Online Forums
  • Engineer's Garage
  • EV Engineering
  • Microcontroller Tips
  • Power Electronic Tips
  • Sensor Tips
  • Test and Measurement Tips

EE WORLD ONLINE

  • Subscribe to our newsletter
  • Teardown Videos
  • Advertise with us
  • Contact us
  • About Us

Copyright © 2025 · WTWH Media LLC and its licensors. All rights reserved.
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media.

Privacy Policy