• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Electrical Engineering News and Products

Electronics Engineering Resources, Articles, Forums, Tear Down Videos and Technical Electronics How-To's

  • Products / Components
    • Analog ICs
    • Connectors
    • Microcontrollers
    • Power Electronics
    • Sensors
    • Test and Measurement
    • Wire / Cable
  • Applications
    • Automotive/Transportation
    • Industrial
    • IoT
    • Medical
    • Telecommunications
    • Wearables
    • Wireless
  • Resources
    • DesignFast
    • Digital Issues
    • Engineering Week
    • Oscilloscope Product Finder
    • Podcasts
    • Webinars / Digital Events
    • White Papers
    • Women in Engineering
  • Videos
    • Teschler’s Teardown Videos
    • EE Videos and Interviews
  • Learning Center
    • EE Classrooms
    • Design Guides
      • WiFi & the IOT Design Guide
      • Microcontrollers Design Guide
      • State of the Art Inductors Design Guide
    • FAQs
    • Ebooks / Tech Tips
  • EE Forums
    • EDABoard.com
    • Electro-Tech-Online.com
  • 5G

Four Finalist States, Others, Fight for Tesla’s ‘Gigafactory’

February 28, 2014 By Joel Hans, Managing Editor, Manufacturing.net

Tesla Motors recently announced that four states are in contention for a massive new $5 billion plant that the company hopes will build batteries for 500,000 cars a year and employ up to 6,500 people. Those states are Nevada, Arizona, Texas and New Mexico, all of which are nearby, on a regional scale, to the company’s existing facility in Fremont, Calif. The company is reportedly already interested in a site near Reno-Stead Airport and the Tahoe Reno Industrial Center — the closest to the Fremont plant — but is apparently open to pitches from the other states.

The plant, which Tesla has coined a “gigafactory,” aims not only to produce enough batteries to fuel all its future electric vehicles, including the entry-level model that the company has been promising for years, but also enough to push down the cost of batteries altogether. On its blog, the company said: “The gigafactory is designed to reduce cell costs much faster than the status quo and, by 2020, produce more lithium-ion batteries annually than were produced worldwide in 2013.”

Tesla is claiming that by the first year of production, the plant will have reduced the per-kilowatt cost of its battery packs by 30 percent — a clear victory in the effort to create a cheaper electric vehicle for a majority of Americans.

The 10 million-square-foot gigafactory will be powered by solar and wind power, which would retain or create even more jobs in the associated industries. Clearly, the benefits for any state to land this projects are immense. There’s a lot on the line.

Nevada, Arizona, Texas and New Mexico are all in the running, but there’s no doubt that other states will try to entice Elon Musk with glamorous incentive packages to manufacture in their state instead. Tesla could be asking for a lot, but it seems that its primary concerns are logistical — being near to airports or other infrastructure that would be able to efficiently move product back to Fremont. Given the fact that the company wants to implement a great deal of solar-based power generation, expect to see incentives in favor of renewable energy production — and don’t be surprised if SolarCity, the solar provider that Elon Musk is the Chairman of, gets a piece of that pie.

The situation is reminiscent of the Boing 777X competition, in which states groveled before the aerospace company for a chance to get the aircraft production, plus its 8,000+ jobs. North Carolina said it “would do anything” for the plant, while Missouri offered $1.7B in incentives, and Illinois lamented being merely a “finalist.”

In the end, Boeing went with what it new best — the machinists in Everett, Wash., just after they signed a new labor contract that both the company and the union agreed upon.

But one thing that is clear in Tesla’s situation, and is different from Boeing’s: Tesla isn’t interested in manufacturing much more, if at all, in California. The company predicts that site selection will be finished in the first few months of 2014, so the four mentioned states, plus any other, must work quickly to put in their bids. It will be interesting to see what kinds of incentives are offered, considering how many felt slighted by Boeing making a lot of insinuations it didn’t live up to.

Filed Under: Automotive/Transportation

Primary Sidebar

EE Training Center Classrooms

EE Classrooms

Featured Resources

  • EE World Online Learning Center
  • CUI Devices – CUI Insights Blog
  • EE Classroom: Power Delivery
  • EE Classroom: Building Automation
  • EE Classroom: Aerospace & Defense
  • EE Classroom: Grid Infrastructure
Search Millions of Parts from Thousands of Suppliers.

Search Now!
design fast globle

R&D World Podcasts

R&D 100 Episode 8
See More >

Current Digital Issue

June 2022 Special Edition: Test & Measurement Handbook

A frequency you can count on There are few constants in life, but what few there are might include death, taxes, and a U.S. grid frequency that doesn’t vary by more than ±0.5 Hz. However, the certainty of the grid frequency is coming into question, thanks to the rising percentage of renewable energy sources that…

Digital Edition Back Issues

Sponsored Content

New Enterprise Solutions for 112 Gbps PAM4 Applications in Development from I-PEX

Positioning in 5G NR – A look at the technology and related test aspects

Radar, NFC, UV Sensors, and Weather Kits are Some of the New RAKwireless Products for IoT

5G Connectors: Enabling the global 5G vision

Control EMI with I-PEX ZenShield™ Connectors

Speed-up time-to-tapeout with the Aprisa digital place-and-route system and Solido Characterization Suite

More Sponsored Content >>

RSS Current EDABoard.com discussions

  • dc to dc converter sparks when inserting fuse
  • ENC28j60 simulation in Proteus over Windows10
  • 12V 5A needed
  • Vco cadencd
  • Slope compensation ramp calculation for UCC38084

RSS Current Electro-Tech-Online.com Discussions

  • Modify a digital clamp ammeter ?
  • How does a blinky/flashing ball work?
  • Control Bare LCD With ATmega328p
  • HV Diodes
  • intro to PI

Oscilloscopes Product Finder

Footer

EE World Online

EE WORLD ONLINE NETWORK

  • 5G Technology World
  • Analog IC Tips
  • Battery Power Tips
  • Connector Tips
  • DesignFast
  • EDABoard Forums
  • Electro-Tech-Online Forums
  • Engineer's Garage
  • Microcontroller Tips
  • Power Electronic Tips
  • Sensor Tips
  • Test and Measurement Tips
  • Wire & Cable Tips

EE WORLD ONLINE

  • Subscribe to our newsletter
  • Lee's teardown videos
  • Advertise with us
  • Contact us
  • About Us
Follow us on TwitterAdd us on FacebookConnect with us on LinkedIn Follow us on YouTube Add us on Instagram

Copyright © 2022 · WTWH Media LLC and its licensors. All rights reserved.
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media.

Privacy Policy