• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Electrical Engineering News and Products

Electronics Engineering Resources, Articles, Forums, Tear Down Videos and Technical Electronics How-To's

  • Products / Components
    • Analog ICs
    • Battery Power
    • Connectors
    • Microcontrollers
    • Power Electronics
    • Sensors
    • Test and Measurement
    • Wire / Cable
  • Applications
    • 5G
    • Automotive/Transportation
    • EV Engineering
    • Industrial
    • IoT
    • Medical
    • Telecommunications
    • Wearables
    • Wireless
  • Learn
    • eBooks / Handbooks
    • EE Training Days
    • Tutorials
    • Learning Center
    • Tech Toolboxes
    • Webinars & Digital Events
  • Resources
    • White Papers
    • Design Guide Library
    • Digital Issues
    • Engineering Diversity & Inclusion
    • LEAP Awards
    • Podcasts
    • DesignFast
  • Videos
    • EE Videos and Interviews
    • Teardown Videos
  • EE Forums
    • EDABoard.com
    • Electro-Tech-Online.com
  • Bill’s Blogs
  • Advertise
  • Subscribe

Jobs vs. Environment in Pinelands Pipe Plan Fracas

December 10, 2013 By WAYNE PARRY, Associated Press

The age-old jobs-versus-the-environment clash is playing out again, this time in the New Jersey Pinelands, a million-acre spread of protected woods and wetlands that happens to be in the way of a proposed pipeline to fuel an old coal-burning power plant with natural gas.

South Jersey Gas wants to build a 22-mile pipeline through the Pinelands to connect with the BL England power plant in Cape May County.

Environmentalists object to the plan, saying it will damage pristine woodlands that, by law, cannot be touched for such projects. But supporters want the jobs the project would bring, and the utility warns that southern New Jersey customers could be left out in the cold without a second means of getting gas to their homes.

Both sides voiced their opinions — loudly and often— at a public hearing Monday that came as some of the Pinelands Commission members appear to be having second thoughts about the proposal, which has the support of New Jersey’s Board of Public Utilities. The commission had scheduled a Jan. 10 vote on the plan, although action could be taken as soon as the end of this week.

“What once seemed like a sure thing that would be rubber-stamped, has now turned into a major battle line in the battle against ‘fracking’ and climate change, and for protection of our national and state parks,” said Capt. Joel Fogel, president of Waterwatch International. Natural gas obtained by hydraulic fracturing is a major concern to environmentalists, but has boosted supplies and dropped the price of natural gas in the eastern U.S.

He said the 24-inch pipeline would be buried 50 feet into the soil, over a sensitive 10,000-year-old, 17 trillion gallon aquifer that supplies water to most of southern New Jersey.

Part of the problem is that Pinelands rules dictate that projects such as the proposed pipeline must primarily benefit residents or businesses within the Pinelands zone; most of the pipeline’s customers are outside the area.

Under a memorandum of agreement, South Jersey Gas would pay $8 million to a Pinelands fund to help clear the project’s final hurdle. The deal would, in effect, exempt the pipeline from a ban on new transmission lines in the 1.1-million-acre Pinelands reserve.

The pipeline would run from Maurice River Township in Cumberland County to the BL England plant in Upper Township. The state has ordered the plant converted or closed permanently to end pollution violations.

“The offer of $8 million from South Jersey Gas is for the soul of the Pinelands,” said Georgina Shanley, an environmental activist from Ocean City, near the power plant. “Is it worth it?”

Carlton Montgomery of the Pinelands Preservation Alliance said the Pinelands Commission has its priorities wrong.

“The commission’s mandate is not to help individual corporations implement their preferred business plans,” he said. “It is to protect the Pinelands.”

William Tracy of Haddonfield said the plan shows a contempt for lands that the federal and state governments have decided should be protected.

“A pressurized pipeline shuttling toxic hydrocarbons seems especially contrary to the concept of a conserved natural area,” he said.

But others see the plan as a source of new jobs and more energy. Jeff Pattison of Absecon is a retired engineer who worked on pipeline projects for 40 years.

“I love the woods, I love to hunt,” he said. “I don’t want to destroy the environment. We look at this as a source of jobs and gas that will burn much more cleanly at the power plant. Everyone needs electricity.”

“A year after they dig it, you won’t even know it’s there,” said Jim Laughlin Sr. of Galloway, another retired pipeline worker. “It’ll give our people a lot of jobs, and that’s really important today.”

Robert Marshall, executive director of the NJ Energy Coalition, said the pipeline is crucial to keeping the Cape May County power plant open, particularly with the Oyster Creek Nuclear Generating Station due to shut down at the end of the decade.

“The bottom line is we need BL England,” he said. “We need a reliable electrical supply, and we need natural gas infrastructure for the greater availability of it.”

You Might Also Like

Filed Under: Power Electronic Tips

Primary Sidebar

EE Engineering Training Days

engineering

Featured Contributions

GaN reliability milestones break through the silicon ceiling

From extreme to mainstream: how industrial connectors are evolving to meet today’s harsh demands

The case for vehicle 48 V power systems

Fire prevention through the Internet

Beyond the drivetrain: sensor innovation in automotive

More Featured Contributions

EE Tech Toolbox

“ee
Tech Toolbox: Internet of Things
Explore practical strategies for minimizing attack surfaces, managing memory efficiently, and securing firmware. Download now to ensure your IoT implementations remain secure, efficient, and future-ready.

EE Learning Center

EE Learning Center
“ee
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for EE professionals.
“bills

R&D World Podcasts

R&D 100 Episode 10
See More >

Sponsored Content

Advanced Embedded Systems Debug with Jitter and Real-Time Eye Analysis

Connectors Enabling the Evolution of AR/VR/MR Devices

Award-Winning Thermal Management for 5G Designs

Making Rugged and Reliable Connections

Omron’s systematic approach to a better PCB connector

Looking for an Excellent Resource on RF & Microwave Power Measurements? Read This eBook

More Sponsored Content >>

RSS Current EDABoard.com discussions

  • BOM sent to Contract assemblers doesnt correspond to schem
  • Amperage changes in DC-DC conversion
  • I/O constraint for Hold check
  • problem identifying pin purpose on PMA5-83-2WC+ amplifier
  • How to best test Electrolytic capacitors for premature failure reduced life?

RSS Current Electro-Tech-Online.com Discussions

  • stud mount Schottky diodes
  • LED circuit for 1/6 scale diorama
  • using a RTC in SF basic
  • Hi Guys
  • Can I use this charger in every country?
Search Millions of Parts from Thousands of Suppliers.

Search Now!
design fast globle

Footer

EE World Online

EE WORLD ONLINE NETWORK

  • 5G Technology World
  • Analog IC Tips
  • Battery Power Tips
  • Connector Tips
  • DesignFast
  • EDABoard Forums
  • Electro-Tech-Online Forums
  • Engineer's Garage
  • EV Engineering
  • Microcontroller Tips
  • Power Electronic Tips
  • Sensor Tips
  • Test and Measurement Tips

EE WORLD ONLINE

  • Subscribe to our newsletter
  • Teardown Videos
  • Advertise with us
  • Contact us
  • About Us

Copyright © 2025 · WTWH Media LLC and its licensors. All rights reserved.
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media.

Privacy Policy