• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Electrical Engineering News and Products

Electronics Engineering Resources, Articles, Forums, Tear Down Videos and Technical Electronics How-To's

  • Products / Components
    • Analog ICs
    • Battery Power
    • Connectors
    • Microcontrollers
    • Power Electronics
    • Sensors
    • Test and Measurement
    • Wire / Cable
  • Applications
    • 5G
    • Automotive/Transportation
    • EV Engineering
    • Industrial
    • IoT
    • Medical
    • Telecommunications
    • Wearables
    • Wireless
  • Learn
    • eBooks / Handbooks
    • EE Training Days
    • Tutorials
    • Learning Center
    • Tech Toolboxes
    • Webinars & Digital Events
  • Resources
    • White Papers
    • Educational Assets
    • Design Guide Library
    • Digital Issues
    • Engineering Diversity & Inclusion
    • LEAP Awards
    • Podcasts
    • DesignFast
  • Videos
    • EE Videos and Interviews
    • Teardown Videos
  • EE Forums
    • EDABoard.com
    • Electro-Tech-Online.com
  • Bill’s Blogs
  • Advertise
  • Subscribe

Mars Rover Mission Progresses Toward Resumed Drilling

October 24, 2017 By Phys.org

NASA’s Mars rover Curiosity team is working to restore Curiosity’s sample-drilling capability using new techniques. The latest development is a preparatory test on Mars.

The five-year-old mission is still several months from the soonest possible resumption of drilling into Martian rocks. Managers are enthusiastic about successful Earth-based tests of techniques to work around a mechanical problem that appeared late last year and suspended use of the rover’s drill.

“We’re steadily proceeding with due caution to develop and test ways of using the rover differently from ever before, and Curiosity is continuing productive investigations that don’t require drilling,” said Deputy Project Manager Steve Lee, of NASA’s Jet Propulsion Laboratory, Pasadena, California.

Curiosity touched its drill to the ground Oct. 17 for the first time in 10 months. It pressed the drill bit downward, and then applied smaller sideways forces while taking measurements with a force sensor.

“This is the first time we’ve ever placed the drill bit directly on a Martian rock without stabilizers,” said JPL’s Douglas Klein, chief engineer for the mission’s return-to-drilling development. “The test is to gain better understanding of how the force/torque sensor on the arm provides information about side forces.”

This sensor gives the arm a sense of touch about how hard it is pressing down or sideways. Avoiding too much side force in drilling into a rock and extracting the bit from the rock is crucial to avoid having the bit get stuck in the rock.

Curiosity has used its drill to acquire sample material from Martian rocks 15 times so far, from 2013 to 2016. It collected powdered rock samples that were delivered to laboratory instruments inside the rover. On each of those occasions, two contact posts—the stabilizers on either side of the bit—were placed on the target rock while the bit was in a withdrawn position. Then a motorized feed mechanism within the drill extended the bit forward, and the bit’s rotation and percussion actions penetrated the rock.

The drill’s feed mechanism stopped working reliably in December 2016. After exploring possibilities of restoring the feed mechanism’s reliability or using it despite unreliability, the project set a priority to develop an alternative method of drilling without use of the feed mechanism. The promising alternative uses motion of the robotic arm to directly advance the extended bit into a rock.

“We’re replacing the one-axis motion of the feed mechanism with an arm that has five degrees of freedom of motion,” Klein said. “That’s not simple. It’s fortunate the arm has the force/torque sensor.”

The sensor’s main use until now has been to monitor for a force so excessive of expectations that it would automatically halt all arm motion for the day. The new “feed-extended” drilling uses it to compensate for side loads. This test will help engineers determine how data from the sensor can be used most effectively.

Using this method, a near-twin of Curiosity at JPL has collected drilled samples from Earth rocks. The team has also developed methods to deliver drilled samples to the laboratory-instrument inlets on the test rover’s deck without use of the drill’s feed mechanism. Development of this alternative sample-transfer technique is needed because the process used previously depended on having the bit in a withdrawn, rather than extended, position.

“The development work and testing here at JPL has been promising,” Lee said. “The next step is to assess the force/torque sensor on Mars. We’ve made tremendous progress in developing feed-extended drilling, using the rover’s versatile capabilities beyond the original design concepts. While there are still uncertainties that may complicate attempts to drill on Mars again, we are optimistic.”

The rover’s current location is on “Vera Rubin Ridge” on lower Mount Sharp. Curiosity is nearing the top of the 20-story-tall ridge. It has been studying the extent and distribution of the iron-oxide mineral hematite in the rocks that make up the erosion-resistant ridge.

You Might Also Like

Filed Under: Uncategorized

Primary Sidebar

EE Engineering Training Days

engineering

Featured Contributions

Integrating MEMS technology into next-gen vehicle safety features

Five challenges for developing next-generation ADAS and autonomous vehicles

Robust design for Variable Frequency Drives and starters

Meeting demand for hidden wearables via Schottky rectifiers

GaN reliability milestones break through the silicon ceiling

More Featured Contributions

EE Tech Toolbox

“ee
Tech Toolbox: 5G Technology
This Tech Toolbox covers the basics of 5G technology plus a story about how engineers designed and built a prototype DSL router mostly from old cellphone parts. Download this first 5G/wired/wireless communications Tech Toolbox to learn more!

EE Learning Center

EE Learning Center
“ee
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for EE professionals.
“bills
contribute

R&D World Podcasts

R&D 100 Episode 10
See More >

Sponsored Content

Designing for Serviceability: The Role of Interconnects in HVAC Maintenance

From Control Boards to Comfort: How Signal Integrity Drives HVAC Innovation

Built to Withstand: Sealing and Thermal Protection in HVAC Sub-Systems

Revolutionizing Manufacturing with Smart Factories

Smarter HVAC Starts at the Sub-System Level

Empowering aerospace E/E design and innovation through Siemens Xcelerator and Capital in the Cloud

More Sponsored Content >>

RSS Current EDABoard.com discussions

  • Diode recovery test Irrm timing.
  • Battery Deep Discharge – IC Workarounds?
  • The Analog Gods Hate Me
  • Safe Current and Power Density Limits in PCB Copper(in A/m² and W/m³) simulation
  • Why so few Phase shift full bridge controllers?

RSS Current Electro-Tech-Online.com Discussions

  • Wideband matching an electrically short bowtie antenna; 50 ohm, 434 MHz
  • The Analog Gods Hate Me
  • Simple LED Analog Clock Idea
  • PIC KIT 3 not able to program dsPIC
  • Parts required for a personal project
Search Millions of Parts from Thousands of Suppliers.

Search Now!
design fast globle

Footer

EE World Online

EE WORLD ONLINE NETWORK

  • 5G Technology World
  • Analog IC Tips
  • Battery Power Tips
  • Connector Tips
  • DesignFast
  • EDABoard Forums
  • Electro-Tech-Online Forums
  • Engineer's Garage
  • EV Engineering
  • Microcontroller Tips
  • Power Electronic Tips
  • Sensor Tips
  • Test and Measurement Tips

EE WORLD ONLINE

  • Subscribe to our newsletter
  • Teardown Videos
  • Advertise with us
  • Contact us
  • About Us

Copyright © 2025 · WTWH Media LLC and its licensors. All rights reserved.
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media.

Privacy Policy