• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Electrical Engineering News and Products

Electronics Engineering Resources, Articles, Forums, Tear Down Videos and Technical Electronics How-To's

  • Products / Components
    • Analog ICs
    • Battery Power
    • Connectors
    • Microcontrollers
    • Power Electronics
    • Sensors
    • Test and Measurement
    • Wire / Cable
  • Applications
    • 5G
    • Automotive/Transportation
    • EV Engineering
    • Industrial
    • IoT
    • Medical
    • Telecommunications
    • Wearables
    • Wireless
  • Learn
    • eBooks / Handbooks
    • EE Training Days
    • Tutorials
    • Learning Center
    • Tech Toolboxes
    • Webinars & Digital Events
  • Resources
    • White Papers
    • Educational Assets
    • Design Guide Library
    • Digital Issues
    • Engineering Diversity & Inclusion
    • LEAP Awards
    • Podcasts
    • DesignFast
  • Videos
    • EE Videos and Interviews
    • Teardown Videos
  • EE Forums
    • EDABoard.com
    • Electro-Tech-Online.com
  • Bill’s Blogs
  • Advertise
  • Subscribe

NTSB probes safety testing of Boeing 787 batteries

April 23, 2013 By JOAN LOWY Associated Press

In this Thursday, Jan. 17, 2013 photo provided by the Japan Transport Safety Board shows the distorted main lithium-ion battery, left, and an undamaged auxiliary battery of the All Nippon Airways' Boeing 787 which made an emergency landing on Wednesday, Jan. 16, 2013 at Takamatsu airport in Takamatsu, western Japan. Federal Aviation Administration and Boeing officials were scheduled to testify at a two-day hearing of the National Transportation Safety Board beginning Tuesday April 23, 2013. The board is asking how problems with the aircraft's lithium-ion battery system that led to a fire aboard one plane and smoke in another escaped the notice of regulators and company officials who certified the plane's safety. (AP Photo/Japan Transport Safety Board, File)WASHINGTON (AP) — As airlines prepare to resume flying Boeing’s beleaguered 787 Dreamliners, federal investigators looked Tuesday at how regulators and the company tested and approved the plane’s cutting-edge battery system, and whether the government cedes too much safety-testing authority to aircraft makers.


The National Transportation Safety Board is also asking how problems with the aircraft’s lithium-ion battery system that led to a fire aboard one plane and smoke in another escaped the notice of regulators and company officials who certified the plane’s safety.


“We are here to understand why the 787 experienced unexpected battery failures following a design program led by one of the world’s leading manufacturers and a certification process that is well-respected throughout the international aviation community,” NTSB’s Chairman Deborah Hersman said at the opening of a two-day board hearing. Officials with the FAA, Boeing and Boeing subcontractors responsible for the battery system were scheduled to testify.


“We are looking for lessons learned not just for the design and certification of the failed battery, but also for knowledge that can be applied to emerging technologies going forward,” Hersman said.


To save manpower, the FAA designates employees at aircraft makers to oversee the safety testing of new planes. Every item that is part of an airplane, down to its nuts and bolts, must be certified as safe before the FAA approves that type of plane as safe for flight. Boeing won FAA safety certification for the 787 in August 2011.


“In a way, the designee system is admitting the FAA doesn’t have the manpower to do what is required, and also that they may not have the expertise,” said John Goglia, a former NTSB board member and aviation safety expert.


The FAA has used designated company employees to oversee and validate some safety testing for more than two decades, a practice critics complain has inherent conflicts of interest. The agency significantly expanded its use of designees in recent years under pressure from manufacturers, who complained it was taking the agency too long to approve new planes because they didn’t have enough staff.


“If industry had to wait for government employees to be available to do the testing” and to develop enough technical knowledge to assess new aviation technologies, “we would just never get any products certified,” Goglia said.


The 787, Boeing’s newest and most technologically-advanced plane, is the first airliner to make extensive use of lithium-ion batteries. It has long been known that lithium batteries are more susceptible than conventional nickel-cadmium batteries to extreme, uncontrolled temperature increases and fires that are very different to put out. But lithium batteries weigh less, store more energy and recharge faster than conventional batteries, making them attractive to airlines.


Boeing did some of the safety testing on the 787 battery system, but much of the testing was done by a subcontractor, Thales of France, which made the 787’s electrical system, and by battery maker GS Yuasa of Japan, according to a previously released NTSB report. The testing concluded there was no chance that short-circuiting would lead to a fire, and the odds of a smoking battery were one in every 10 million flight hours.


Instead, there were two battery failures when the entire 787 fleet had clocked less than 52,000 flight hours. The first was on Jan. 7 aboard a Japan Airlines 787 parked at Boston’s Logan International Airport shortly after landing following an overseas flight. Firefighters reported two small flames and dense clouds of white smoke streaming from the battery. It took over an hour before they declared the incident under control.


Nine days later a smoking battery aboard an All Nippon Airways 787 led to an emergency landing in Japan. The Federal Aviation Administration ordered all U.S.-registered 787s grounded the same day, and aviation authorities in other countries swiftly followed suit.


The NTSB, which is investigating the Boston incident, hasn’t yet determined the root cause of the fire and may never be able to do so. The insides of the battery were severely charred, leaving few clues for investigators.


Boeing has since developed and tested a revamped version of the battery system, with changes designed to prevent a fire or to contain one should it occur. FAA officials approved the revamped batteries last week and agreed to lift the grounding order. The company has been working furiously to install the new system on the 50 Dreamliners in service worldwide. Boeing has orders for 840 of the planes from airlines around the globe.


What the NTSB uncovers regarding the FAA’s safety certification program could have important implications for the agency’s ability to handle other technology challenges, including the transition to a new air traffic control system and the introduction of unmanned aircraft into the national airspace, said Jim Hall, a former safety board chairman.


“It’s important to know that the government has oversight capability,” Hall said. “Our aviation safety, which is unparalleled at the moment in the world, has been built on having active oversight by the FAA.”

You Might Also Like

Filed Under: Components

Primary Sidebar

EE Engineering Training Days

engineering

Featured Contributions

Five challenges for developing next-generation ADAS and autonomous vehicles

Robust design for Variable Frequency Drives and starters

Meeting demand for hidden wearables via Schottky rectifiers

GaN reliability milestones break through the silicon ceiling

From extreme to mainstream: how industrial connectors are evolving to meet today’s harsh demands

More Featured Contributions

EE Tech Toolbox

“ee
Tech Toolbox: 5G Technology
This Tech Toolbox covers the basics of 5G technology plus a story about how engineers designed and built a prototype DSL router mostly from old cellphone parts. Download this first 5G/wired/wireless communications Tech Toolbox to learn more!

EE Learning Center

EE Learning Center
“ee
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for EE professionals.
“bills
contribute

R&D World Podcasts

R&D 100 Episode 10
See More >

Sponsored Content

Advanced Embedded Systems Debug with Jitter and Real-Time Eye Analysis

Connectors Enabling the Evolution of AR/VR/MR Devices

Award-Winning Thermal Management for 5G Designs

Making Rugged and Reliable Connections

Omron’s systematic approach to a better PCB connector

Looking for an Excellent Resource on RF & Microwave Power Measurements? Read This eBook

More Sponsored Content >>

RSS Current EDABoard.com discussions

  • 'HERIC' pairs of IGBTs essential for Mains inverters
  • How to start a startup in VLSI
  • UART Basic Before Writing Code
  • Single ended measuring ports and balanced antenna
  • Thermal modelling of repetitive power pulse

RSS Current Electro-Tech-Online.com Discussions

  • Fun with AI and swordfish basic
  • Simple LED Analog Clock Idea
  • Microinverters and storeage batteries?
  • PIC KIT 3 not able to program dsPIC
  • Is AI making embedded software developers more productive?
Search Millions of Parts from Thousands of Suppliers.

Search Now!
design fast globle

Footer

EE World Online

EE WORLD ONLINE NETWORK

  • 5G Technology World
  • Analog IC Tips
  • Battery Power Tips
  • Connector Tips
  • DesignFast
  • EDABoard Forums
  • Electro-Tech-Online Forums
  • Engineer's Garage
  • EV Engineering
  • Microcontroller Tips
  • Power Electronic Tips
  • Sensor Tips
  • Test and Measurement Tips

EE WORLD ONLINE

  • Subscribe to our newsletter
  • Teardown Videos
  • Advertise with us
  • Contact us
  • About Us

Copyright © 2025 · WTWH Media LLC and its licensors. All rights reserved.
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media.

Privacy Policy