• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Electrical Engineering News and Products

Electronics Engineering Resources, Articles, Forums, Tear Down Videos and Technical Electronics How-To's

  • Products / Components
    • Analog ICs
    • Battery Power
    • Connectors
    • Microcontrollers
    • Power Electronics
    • Sensors
    • Test and Measurement
    • Wire / Cable
  • Applications
    • 5G
    • Automotive/Transportation
    • EV Engineering
    • Industrial
    • IoT
    • Medical
    • Telecommunications
    • Wearables
    • Wireless
  • Learn
    • eBooks / Handbooks
    • EE Training Days
    • Tutorials
    • Learning Center
    • Tech Toolboxes
    • Webinars & Digital Events
  • Resources
    • White Papers
    • Design Guide Library
    • Digital Issues
    • Engineering Diversity & Inclusion
    • LEAP Awards
    • Podcasts
    • DesignFast
  • Videos
    • EE Videos and Interviews
    • Teardown Videos
  • EE Forums
    • EDABoard.com
    • Electro-Tech-Online.com
  • Bill’s Blogs
  • Advertise
  • Subscribe

South Korea Renews License of 2nd-Oldest Nuclear Plant

February 27, 2015 By Youkyung Lee, AP Technology Writer

In this Thursday, Feb. 26, 2015, photo, environmentalists stage a rally against nuclear power plants near the government complex in Seoul, South Korea. The Nuclear Safety and Security Commission said Friday, Feb. 27 that seven of nine commissioners voted to approve to restart the Wolsong No. 1 reactor located in Gyeongju city, 275 kilometers (170 miles) south of Seoul. It was South Korea's first such decision since the meltdowns at Japan's Fukushima Daiichi reactors in 2011 raised safety concerns. The letters on banners read " Demand the Wolsong No. 1 reactor be permanently shut down. " (AP Photo/Ahn Young-joon)The South Korean nuclear regulator said Friday it renewed the operating license of the country’s second-oldest nuclear power plant until 2022, overriding the objections of residents and anti-nuclear groups.

The Nuclear Safety and Security Commission said that seven of nine commissioners voted to restart the Wolsong No. 1 reactor located in Gyeongju city, 275 kilometers (170 miles) south of Seoul.

It was the first such decision in South Korea since safety concerns about nuclear energy and older plants were raised following the meltdowns at Japan’s Fukushima Daiichi reactors in 2011. South Korea’s 23 nuclear power plants mostly located in the country’s southeastern coast provide about one-third of its electricity.

The nuclear regulator said in a statement that it reviewed the plant’s ability to withstand natural disasters and its compliance with other legal standards. Two commissioners who asked for more time to review the reactor’s safety abstained from the vote at the end of the 14-hour meeting that began Thursday morning and ended past midnight Friday.

South Koreans were sharply divided over the fate of the Wolsong No. 1 plant that had operated for 30 years until its license expired in 2012. Residents of Gyeongju and members of environmental groups staged protests near the nuclear watchdog’s office when the commissioners discussed the restart in three meetings since January.

The decision to restart Wolsong No. 1 could galvanize opponents and residents living in the areas of current and future plants, said Suh Kune-yull, nuclear engineering professor at Seoul National University.

“I think there could be a backlash to the nuclear energy industry,” Suh said. “It will become increasingly difficult to extend the lifespan of other nuclear plants or to build new ones.”

The fate of South Korea’s oldest nuclear plant, Kori No. 1, could be reviewed in the next year as the nuclear plant operator must decide by the end of 2015 whether to seek renewal of its operating license. South Korea’s government is also seeking to build more nuclear power plants.

Opponents of the Wolsong restart said the plant failed to meet the latest safety standards that came into effect after the reactor first went into operation, and that residents near the power plant want it shut down. Supporters said the safety concerns were overblown and that South Korea, which imports oil and gas, needs the cheap energy source.

Korea Hydro and Nuclear Power, the state-owned monopoly nuclear plant operator, spent 560 billion won ($509 million) to upgrade the reactor before seeking the approval.

You Might Also Like

Filed Under: Automotive/Transportation

Primary Sidebar

EE Engineering Training Days

engineering

Featured Contributions

GaN reliability milestones break through the silicon ceiling

From extreme to mainstream: how industrial connectors are evolving to meet today’s harsh demands

The case for vehicle 48 V power systems

Fire prevention through the Internet

Beyond the drivetrain: sensor innovation in automotive

More Featured Contributions

EE Tech Toolbox

“ee
Tech Toolbox: Internet of Things
Explore practical strategies for minimizing attack surfaces, managing memory efficiently, and securing firmware. Download now to ensure your IoT implementations remain secure, efficient, and future-ready.

EE Learning Center

EE Learning Center
“ee
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for EE professionals.
“bills

R&D World Podcasts

R&D 100 Episode 10
See More >

Sponsored Content

Advanced Embedded Systems Debug with Jitter and Real-Time Eye Analysis

Connectors Enabling the Evolution of AR/VR/MR Devices

Award-Winning Thermal Management for 5G Designs

Making Rugged and Reliable Connections

Omron’s systematic approach to a better PCB connector

Looking for an Excellent Resource on RF & Microwave Power Measurements? Read This eBook

More Sponsored Content >>

RSS Current EDABoard.com discussions

  • GanFet power switch starts burning after 20 sec
  • Core loss in output inductor of 500W Two Transistor forward?
  • Looking for spice model for Innoswitch3-EP
  • Question LCD LED IPS display
  • Colpitts oscillator

RSS Current Electro-Tech-Online.com Discussions

  • An Update On Tarrifs
  • Need Help Figuring Out the Schematics Of Circuit Board
  • Component tracks and pins are empty in proteus 8 (void)
  • Wish to buy Battery, Charger and Buck converter for 12V , 2A router
  • applying solder paste from a jar
Search Millions of Parts from Thousands of Suppliers.

Search Now!
design fast globle

Footer

EE World Online

EE WORLD ONLINE NETWORK

  • 5G Technology World
  • Analog IC Tips
  • Battery Power Tips
  • Connector Tips
  • DesignFast
  • EDABoard Forums
  • Electro-Tech-Online Forums
  • Engineer's Garage
  • EV Engineering
  • Microcontroller Tips
  • Power Electronic Tips
  • Sensor Tips
  • Test and Measurement Tips

EE WORLD ONLINE

  • Subscribe to our newsletter
  • Teardown Videos
  • Advertise with us
  • Contact us
  • About Us

Copyright © 2025 · WTWH Media LLC and its licensors. All rights reserved.
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media.

Privacy Policy