The equipment will be installed in Powertec’s new polysilicon facility which is expected to begin production in 2012. The order will be included in GT Solar’s backlog for its current Q1 FY12, which ends on July 2, 2011.
Electrical Engineering News and Products
Electronics Engineering Resources, Articles, Forums, Tear Down Videos and Technical Electronics How-To's