• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Electrical Engineering News and Products

Electronics Engineering Resources, Articles, Forums, Tear Down Videos and Technical Electronics How-To's

  • Products / Components
    • Analog ICs
    • Battery Power
    • Connectors
    • Microcontrollers
    • Power Electronics
    • Sensors
    • Test and Measurement
    • Wire / Cable
  • Applications
    • 5G
    • Automotive/Transportation
    • EV Engineering
    • Industrial
    • IoT
    • Medical
    • Telecommunications
    • Wearables
    • Wireless
  • Learn
    • eBooks / Handbooks
    • EE Training Days
    • Tutorials
    • Learning Center
    • Tech Toolboxes
    • Webinars & Digital Events
  • Resources
    • White Papers
    • Educational Assets
    • Design Guide Library
    • Digital Issues
    • Engineering Diversity & Inclusion
    • LEAP Awards
    • Podcasts
    • DesignFast
  • Videos
    • EE Videos and Interviews
    • Teardown Videos
  • EE Forums
    • EDABoard.com
    • Electro-Tech-Online.com
  • Bill’s Blogs
  • Advertise
  • Subscribe

IAEA: Japan Nuke Cleanup May Take More Than 40 Yrs

April 22, 2013 By MARI YAMAGUCHI, Associated Press

A U.N. nuclear watchdog team said Japan may need longer than the projected 40 years to decommission its tsunami-crippled nuclear plant and urged its operator to improve plant stability.

The head of the International Atomic Energy Agency team, Juan Carlos Lentijo, said Monday that damage at the Fukushima Dai-ichi plant is so complex that it is “impossible” to predict how long the cleanup may last.

“As for the duration of the decommissioning project, this is something that you can define in your plans. But in my view, it will be nearly impossible to ensure the time for decommissioning such a complex facility in less than 30-40 years as it is currently established in the roadmap,” Lentijo said.

The government and plant operator Tokyo Electric Power Co. have predicted the cleanup would take up to 40 years. They still have to develop technology and equipment that can operate under fatally high radiation levels to locate and remove melted fuel. The reactors must be kept cool and the plant must stay safe and stable, and those efforts to ensure safety could slow the process down.

“You have to adopt a very cautious position to ensure that you always are working on the safe side,” Lentijo said.

The plant still runs on makeshift equipment and frequently suffers glitches.

Just over the past few weeks, the plant suffered nearly a dozen problems ranging from extensive power outages and leaks of highly radioactive water from underground water pools. On Monday, TEPCO had to stop the cooling system for one of the fuel storage pools for safety checks after finding two dead rats inside a transformer box. Earlier this month, a rat short-circuited a switchboard, causing an extensive outage and cooling loss for up to 30 hours.

The problems have raised concerns about whether the plant, crippled by the March 2011 earthquake and tsunami, can stay intact throughout a decommissioning process. The problems have prompted officials to compile risk-reduction measures and review decommissioning plans.

Lentijo, an expert on nuclear fuel cycles and waste technology, warned of more problems to come.

“It is expectable in such a complex site, additional incidence will occur as it happened in the nuclear plants under normal operations,” Lentijo said. “It is important to have a very good capability to identify as promptly as possible failures and to establish compensatory measures.”

The IAEA team urged the plant operator to “improve the reliability of essential systems to assess the structural integrity of site facilities, and to enhance protection against external hazards” and promptly replace temporary equipment with a more reliable, permanent system.

The 12-member mission plans to release a report next month.

Among the most pressing issues recently was the leak of tons of highly radioactive water from three of seven underground storage pools into the soil. TEPCO and regulatory officials said none of it was believed to have reached the ocean. TEPCO has moved underground water from the pools to more reliable tanks.

The contaminated water storage has been a problem since early in the accident, but officials acknowledged this month that a lack of storage space has become a “crisis.” TEPCO has promised to speed up building more reliable steel tanks and eventually empty the underground tanks, but the leaks will continue until then. Runoff from the three reactors melted in the aftermath of the March 2011 quake-tsunami and a steady inflow of groundwater seeping into the basement of their damaged buildings produce about 400 tons of contaminated water daily at the plant.

TEPCO says 280,000 tons of contaminated water has been stored in tanks on the plant, and the amount would double within a few years.

You Might Also Like

Filed Under: Automotive/Transportation

Primary Sidebar

EE Engineering Training Days

engineering

Featured Contributions

Why outdoor charging demands specialized battery connectors

How Li-ion batteries are powering the shift in off-highway equipment

Integrating MEMS technology into next-gen vehicle safety features

Five challenges for developing next-generation ADAS and autonomous vehicles

Robust design for Variable Frequency Drives and starters

More Featured Contributions

EE Tech Toolbox

“ee
Tech Toolbox: 5G Technology
This Tech Toolbox covers the basics of 5G technology plus a story about how engineers designed and built a prototype DSL router mostly from old cellphone parts. Download this first 5G/wired/wireless communications Tech Toolbox to learn more!

EE Learning Center

EE Learning Center
“ee
EXPAND YOUR KNOWLEDGE AND STAY CONNECTED
Get the latest info on technologies, tools and strategies for EE professionals.
“bills
contribute

R&D World Podcasts

R&D 100 Episode 10
See More >

Sponsored Content

Designing for Serviceability: The Role of Interconnects in HVAC Maintenance

From Control Boards to Comfort: How Signal Integrity Drives HVAC Innovation

Built to Withstand: Sealing and Thermal Protection in HVAC Sub-Systems

Revolutionizing Manufacturing with Smart Factories

Smarter HVAC Starts at the Sub-System Level

Empowering aerospace E/E design and innovation through Siemens Xcelerator and Capital in the Cloud

More Sponsored Content >>

RSS Current EDABoard.com discussions

  • Step Up Push Pull Transformer design / construction
  • How to create custom diode and add its netlist into Ansys circuit designer schematic?
  • Two sections broadband impedance matching
  • connector model question
  • LLC converter shoot through currents at start-up

RSS Current Electro-Tech-Online.com Discussions

  • Wierd makita battery
  • More fun with ws2812 this time XC8 and CLC
  • I Wanna build a robot
  • Impact of Tariffs on PCB Fab
  • Earbud wiring w/ mic
Search Millions of Parts from Thousands of Suppliers.

Search Now!
design fast globle

Footer

EE World Online

EE WORLD ONLINE NETWORK

  • 5G Technology World
  • Analog IC Tips
  • Battery Power Tips
  • Connector Tips
  • DesignFast
  • EDABoard Forums
  • Electro-Tech-Online Forums
  • Engineer's Garage
  • EV Engineering
  • Microcontroller Tips
  • Power Electronic Tips
  • Sensor Tips
  • Test and Measurement Tips

EE WORLD ONLINE

  • Subscribe to our newsletter
  • Teardown Videos
  • Advertise with us
  • Contact us
  • About Us

Copyright © 2025 · WTWH Media LLC and its licensors. All rights reserved.
The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media.

Privacy Policy