The Ascent Solar IEC 61646 (20 year life expectancy) certified and UL certification (safety test) pending modules will be compared side-by-side against existing thin-film modules currently installed at JMTC.
The test installation is done to collect performance data, evaluate architecture aesthetics and showcase the potential of Ascent Solar’s CIGS high-power modules against the current thin-film technology. For the pilot, installation modules have been applied to the top surface of the roofing membrane. The long-term objective is to integrate the modules into the roofing material itself as a factory-applied solution that JM markets under the Power Blanket brand. This external deployment will help set a standard for the integration and installation of lightweight flexible CIGS modules going forward as this will be the first time a CIGS monolithically integrated module manufactured using a plastic substrate has been integrated onto an existing commercial roofing installation for competitive commercial evaluation.